The Finishing "TO DO" List:

One thing Justin and I agree on is to finish the main floor 100% before moving on to the next set of renovations.  We know that whatever we leave behind will most likely NOT get finished and that is NOT okay.

With just a few things left on the list, this post will serve as a reminder as well as a flame under my buttocks to get these things done.  Oh! and I love lists. :]


1.  Paint and cover hall light switch plate.
2.  Purchase and install oven hood
3.  Finish Garage door trimmings
4.  Apply backsplash over above sink light drywall
5.  Nail in the board on the kitchen side of the kitchen/dining doorway
6.  Fix wall damage next to fridge
7.  Paint chip on mantle
8.  Regrout fireplace tile and paint the insideof the fire place black
9.  Stain closet door and reattach door handle
10. Purchase and install undercabinet lighting

With these things complete, we I will be ready for the big upstairs renovation.  :]

HEEERRREEE WEEEE GOOOOOOO!!!